During the project STATS was approached by Allseas, which was responsible for the pipe lay campaign, to design and manufacture the pipeline Pull Head. STATS utilized an existing model from Allseas and modified it to interface with the de-watering isolation tool supplied by STATS.
The pipe is connected to the drill stem with a swiveled pull head to prevent it from twisting during pullback, and is pulled into place by the drill rig.