absorption rate

(redirected from cost rate)
Also found in: Encyclopedia.

Absorption Rate

The rate at which vacant business or residential space in an area is sold or rented over a given period of time. The absorption rate is expressed in square feet sold/leased as a percentage of the total available. Alternatively, one may express it as units (or homes) sold as a percentage of the total.

absorption rate

or

cost rate

or

recovery rate

a means of charging OVERHEADS to products. By relating budgeted overhead costs to budgeted output, it is possible to calculate an overhead absorption rate per unit of product to add to the standard DIRECT COST (direct materials cost and direct labour cost) of a product in order to determine its production cost. Alternatively production overheads can be charged as a percentage on the direct labour cost of a product; or a percentage on the direct materials cost of the product; or on the basis of the direct labour hours to make the product (at a rate per direct labour hour); or on the basis of the machine hours needed to make the product (at a rate per machine hour).

Once the production cost of a product has been determined by adding production overheads, then a further addition must be made to cover selling, distribution and administration overheads. These can be allowed for by means of other cost rates, such as by adding an appropriate percentage to the production cost of the product. The addition of overhead cost rates to the standard direct cost of products serves to establish their total cost, and facilitates their ABSORPTION through selling prices. See BUDGET, STANDARD COST.

absorption rate

The rate at which vacant space is leased or purchased over a specified period of time. The absorption rate for commercial property is usually expressed in square feet per year; residential property is quoted in units (homes) per year.

Mentioned in ?
References in periodicals archive ?
However, for each strategy, this cost rate will be on another level (calculations in the table below).
Multiplying the capacity cost rate for the cost center ($0.
The Contractor shall update the schedule of cumulative direct and indirect costs claimed and billed within 60 days after settlement of final indirect cost rates.
Figure 3 shows the planned incremental cost rate characteristics of a power unit.
And how much will it cost rate payers of Birmingham?
The reference rate is the opportunity cost rate of money, where the risk premium has been eliminated to the greatest extent possible and intermediation services are excluded.
FINANCIAL VANTAGEPOIN[TM] COST RATE SOFTWARE, VantagePoint System Inc.
Government agencies have strict guidelines that control the calculation of the Facilities and Administrative (F&A) cost rate for an institution.
Maintenance 1,250 $2,250 Table 3 Apron Services Resource Pool's Cost Rates Planned Cost Planned Cost Rate: Resource Pool Output Unit Rate: Fixed Proportional Fueling Rig Equipment Hours $200.
Indirect Cost Rate: OPOs and other eligible entities may not have previously negotiated indirect cost rates with the government.
Companies that don't pay deductions for damage and have a reimbursement cap have a lower than average unsalables cost rate.
5 cents/VMT) and the cost rate after was $45,963/MVKT ($74,000/MVMT) or 4.