Precompute


Also found in: Dictionary.

Precompute

Method of charging interest in which the annual interest is either deducted from the face amount of the loan when the funds are distributed or is added to the total amount and divided into the regular payments.

Precompute

To calculate the annual interest owed on a loan by either deducting the annual interest from the face amount of the loan, or adding the compound interest together and dividing it out equally over 12 monthly periods. This means that the effective interest paid will be higher than the stated amount on the loan. Because of this, most jurisdictions require lending institutions using precomputation to express the interest rate in simple interest terms.
Mentioned in ?
References in periodicals archive ?
The first technique enhances mkillum so it can precompute light output from CFS portals (windows or skylights) using BSDF data, permitting a broader array of systems to be modeled.
To update each run in constant time, they precompute loc(j, x) = [min.
5) first and precompute optimised entries for the sparse matrix B to achieve higher accuracy [30, 31].
In contrast, algorithms that perform static cost computations, precompute relative costs, and store differential costs for nonterminals.
It is useful in such situations to precompute all the n(n - 1)/2 pairwise distance values for the n patterns and store them in a (symmetric) matrix.
Consequently, it is not possible to precompute a database of expansions (with the patterns as keys) for fast lookup.
We can precompute the table LCM in O(n log n log log n) time.
With open it is not possible to precompute free and bound variables for each source.
In fact, if dqds is used to precompute the singular values (cf.
The time to precompute intraprocedural kill information for each procedure is bounded by O(w * [CFE.
This would increase the number of bits of vertex information that would have to be carried with the 3D models, if one desired to precompute and store them rather than compute them only when needed.
We precompute the depth-first number (dfn) and the number of descendents (des) for each node in the DT.