In online advertising, the measurement of cost paid by an advertiser per 1,000 impressions of its advertisement. One impression is one view of the advertisement by a website viewer. Many websites, especially those with high traffic, charge advertisers on a per 1,000 impression basis. It differs from a cost per click scheme, in that the viewer does not have to click on the ad in order for the advertiser to be charged.

CPM

See Certified Property Manager.

References in periodicals archive ?
They also suggested a metric distance ranking method for the fuzzy numbers to a critical path method for the fuzzy project network, where the time duration of each activity in a fuzzy project network is represented by a trapezoidal fuzzy number (Shankar et al.
A Critical Path Method (CPM) Scheduling for small projects with ten activities or less and an overall duration of one year or less.
The typical Critical Path Method (CPM) schedule assumes that the project team knows how long the scheduled activities will take.
Tenders are invited for general contracting services for the renovation of an approximately 6,600 sf medical office building, to include but not limited to pre-construction phase services such as cost estimating, value engineering, critical path method scheduling, constructability reviews and cost control, in addition to phased construction management services, site work, parking and site work infrastructure.
Buric's lead Building Information Modeling (BIM) expert, will discuss how incorporating Critical Path Method (CPM) scheduling with BIM can result in transparency and data-sharing capabilities that better manage construction projects.
For more than thirty years, Construction Project Management by Clough and Sears has been considered the preeminent guide to the Critical Path Method (CPM) of project scheduling.
Description: The Contractorshall plan, schedule and construct the Project by using a Critical Path Method Project Schedule (CPM) meeting the requirements of these specifications.
Founded in 1995, Chitester Management is a nationally recognized engineering and construction consulting firm providing professional expertise in construction claims analysis, claims avoidance/dispute resolution, Critical Path Method (CPM) scheduling, project management, and continuing education seminars to contractors, engineers, architects, owners, attorneys, and insurers.
In agreement with UNDP approve the detailed schedule of works prepared by the Contractor with the critical path method.
DESCRIPTION OF SERVICES: The City of Virginia Beach is soliciting statements of interest and qualifications from interested firms to provide Construction Administration, and Inspection Services including, but not limited to; construction administration; project management; construction management; construction inspection; quality control and quality assurance; material sampling, testing and certifications; surveying; utility designation and location; constructability reviews; biddability reviews; value engineering; construction schedule and critical path method (CPM) reviews; delay claims analysis; cost estimating; construction document review; payment review and processing (to include all applicable documentation).
Established in 1968, Buric provides building information modeling; construction planning and critical path method scheduling; construction claims resolution, including forensic investigation, demonstrative graphics and expert witness capability; surety contract management; building diagnostics and rehabilitation; project management and control; and architectural and engineering design services.
His in-depth scheduling experience includes Critical Path Method, Precedent Diagram Method, and Arrow Diagram Method for applications.