capacity requirements planning

capacity requirements planning

the management of resource over a planned time period when related to manufacturing planning. See MATERIALS REQUIREMENT PLANNING, MANUFACTURING RESOURCE PLANNING. (See MRP and MRP II).
Mentioned in ?
References in periodicals archive ?
Over 30 employees were trained in three phases, undergoing discussion and solution, capacity requirements Planning and User Access Training, working project by project to ensure ample understanding of business requirements basics.
In that condition, the main production planning, material requirements planning, capacity requirements planning and other plans of the planning system need to be calculated separately, and the Coordination of multi-level plans is completed manually.
Material Requirements Planning (MRP), Manufacturing Resource Planning (MRP II) and Capacity Requirements Planning (CRP) are necessary to be processed in an integrated way in order to achieve better results(Egri et al.
0 also lets businesses effectively manage manufacturing processes including production orders, bills of material, demand forecasting, supply planning and capacity requirements planning.
The article therefore develops a secondary criterion for load smoothing in a capacity requirements planning context, and an alternative secondary criterion in terms of capacity cushions that is helpful in a capacity planning context.
PTF3 also includes enhancements to Customer Relationship Management (CRM), Capacity Requirements Planning (CRP), General Ledger Financial Report Writer and Warehouse Management.
Its function is to provide a logical way to support the information needs of a production planning and control system for performing functions such as material requirements planning (MRP), capacity requirements planning (CRP), operations scheduling and shop floor control.
For computerized capacity requirements planning and shop floor control, the numbers hover around 50%, with roughly 20% planning computerization in the future.
Available system functions include: Part Master and Bills of Material, Engineering Change Control, Part Cross Reference; Customer Maintenance, Sales Orders, Forecasting and Job Tracking; Supplier Maintenance and Purchase Orders; Work Orders, Sub-contracting; Inventory Control, Cost Maintenance, Cycle Counting and Physical Inventory: Materials Requirement Planning (MRP); Capacity Requirements Planning (CRP); and WIP Visibility and Labor Distribution and an Online Help function.
The manufacturing suite has more than 10 applications which include material requirements planning (MRP), capacity requirements planning (CRP), master production scheduling (MPS), manufacturing order processing (MOP), production costing, and job costing.
Lee also plans to install Macola's Manufacturing modules including Master Scheduling, Material Requirements Planning, Job Costing, Shop Floor Control, Standard Product Routing, Standard Product Costing, Labor Performance, and Capacity Requirements Planning.
PeopleSoft has combined MRP, Capacity Requirements Planning, Distribution Requirements Planning, and Master Production Scheduling into two applications: PeopleSoft Production Planning and PeopleSoft Enterprise Planning.

Full browser ?