References in periodicals archive ?
As BOS-I and integrated base defense controls and protects throughout the base security zone, the CMRE S2/FP becomes important and a contributor/enabler as all organic assists are moved or descoped.
We also adjusted the schedule several times based on the knowledge of developer velocity and features that could be descoped and/or deferred.
In 2007 an independent review put the expected cost to completion of a descoped (reduced scope) project at pounds 5.